Clause

52.236-21_Alternate I Specifications and Drawings for Construction.

(a) The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who sh

Text excerpt from the eCFR API; read the full clause at the eCFR link above.

This is Alternate I of clause 52.236-21; the Alternate text sits inside the same eCFR section as the base clause.

Applicability in the matrix

Contract types for 52.236-21_Alternate I as published in the Smart Matrix
IBRYes Incorporated by reference
UCFI
FP CONA As prescribed
DDRA As prescribed
SAPO Optional

Reporting, not advice

MyFCExperts reports what the official federal clause matrix says applies at a given contract type, and what each clause says and where it is prescribed. It does not determine whether a specific contract or subcontract is compliant, and nothing here is legal advice or creates an attorney-client relationship. Always read the linked primary source and consult a qualified professional for your own situation.

Follow the clause matrix without re-reading it

The clause reference is free to browse. The MyFCExperts Clause Access membership adds saved contract profiles and the nightly clause-change feed for the contract types you pin. (The full clause matrix and flow-down views stay free.).

Join for $129 one-time Create a free account